Tender Notice No. | Description of the Tender | Due date for submission of Tender | Download Tender Document |
---|---|---|---|
TIFR/PD/RC21-22/200001 |
Corrigendum No. 1 for Rate Contract For the Chemicals, Glassware’s and Lab wares for TIFR Hyderabad.Rate Contract Period – One Year with Effect From 01.04.2021 to 31.03.2022 |
19-04-2021 upto 13.00 Hrs |
|
TIFR/PD/RC21-22/200001 |
Rate Contract For the Chemicals, Glassware and Lab wares for TIFRH. Rate Contract Period – One Year with Effect From 01.04.2021 to 31.03.2022 |
14-04-2021 |
|
TIFR/PD/IC20-10/20010 |
Corrigendum No. 1 for Supply and Installation of Ion milling/Sputtering high vacuum chamber with ECR Ion gun with Einzel lens for Tata Institute of Fundamental Research, Hyderabad. |
15-03-2021 upto 13:00 Hrs. |
|
TIFR/PD/CA20-90/201040 |
Corrigendum No – 1 for Supply, Installation, Testing and Commissioning of Cassette ACs and all related works at Hanger Building-1, TIFR, Plot-B, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046. Technical Bid Opening on Mar 08, 2021 – 03:00 PM India |
08-03-2021 upto 13:00 Hrs. |
|
TIFR/PD/CA20-27/200399 |
Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad. Pre-bid meeting on Mar 09, 2021 – 11:00 AM India BIDDERS WILL NOT BE ALLOWED TO JOIN AFTER 11.00 AM |
30-03-2021 upto 13.00 Hrs. |
|
TIFR/PD/CA20-90/201040 |
Supply, Installation, Testing and Commissioning of Cassette ACs and all related works at Hanger Building-1, TIFR, Plot-B, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046. |
05-03-2021 upto 13:00 Hrs. |
|
TIFR/PD/CF20-104/201031 |
Construction of MS Structure and Roofing Work for Hostel Block -II at plot B, Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. opening of technical bids on Mar 09, 2021 – 03:00 PM India |
09-03-2021 upto 13:00 Hrs. |
|
TFR/PD/CF20-95/200981 |
Annual Maintenance Contract for Outsourcing Manpower for Maintenance of Horticulture, Landscaping and supply of related materials at TIFRH-Hyderabad. opening of price bids on Feb 24, 2021 – 03:00 PM India |
23-02-2021 upto 13:00 Hrs. |
|
TIFR/PD/IC20-12/20012 |
Supply, Installation and Commissioning of Crystallization Screening Robotic System With Accessories |
09-03-2021 upto 13:00 Hrs. |
|
TIFR/PD/IC20-10/20010 |
Supply, Installation and Commissioning of Ion milling/sputtering high vacuum chamber with ECR Ion gun with Einzel Lens |
08-03-2021 upto 13:00 Hrs. |
|
TIFR/PD/IC20-08/20008 |
Corrigendum No. 2 for Supply, Installation and Commissioning of GPU Based High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad |
10-02-2021 upto 13:00 Hrs. |
|
TIFR/PD/CF20-80/200845 |
Supply, Installation, Testing and Commissioning of Internal Electrification and all related works in Hostel Block -1 at TIFR, Plot-B, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046 Price Bid Opening on Feb 05, 2021 – 03:30 PM India |
03-02-2021 upto 13.00 Hrs. |
|
TIFR/PD/IC20-08/20008 |
Corrigendum No. 1 for Supply, Installation and Commissioning of GPU Based High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad |
03-02-2021 upto 13.00 Hrs. |
|
TIFR/PD/CF20-69/200735 |
Corrigendum for Construction of Civil Structure, Interior and Plumbing Work for Guest House & Hostel at plot B, No. Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. Join for opening of the Financial bid on Jan 28, 2021 – 11:00 AM India |
25-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/CF20-74/200779 |
Construction of Sub Structure for Hostel Block -II at plot B, No. Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. Join opening of Financial Bid on Jan 27, 2021 – 03:00 PM India |
25-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/IC20-08/20008 |
Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad. Join the pre-bid meeting on Jan 19, 2021 – 11:00 AM India BIDDERS WILL NOT BE ALLOWED TO JOIN AFTER 11.00 AM |
03-02-2021 upto 13.00 Hrs. |
|
TFR/PD/CF20-69/200735 |
Construction of Civil Structure, Interior and Plumbing Work for Guest House & Hostel at plot B, TIFR, Hyderabad. Join for Pre-Bid Meeting on Jan 18, 2021 03:00 PM India |
25-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/TS/9030 |
Corrigendum 1 for Construction of MS Structure and Roofing work for Guest House & Hostel at plot B, No. Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. |
12-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/TS/9030 |
Construction of MS Structure and Roofing work for Guest House & Hostel at plot B, No. Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. Join for Pre-Bid Meeting on Jan 05, 2021 03:00 PM India |
12-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/TS/9029 |
Construction of Sub Structure for Guest House & Hostel at plot B, No. Survey No. 36/P, Gopanpally Village,Serilingampally Mandal, Ranga Reddy District, Hyderabad. Join for Public Tender opening on Jan 06, 2021 03:00 PM India |
06-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/CF20-48/200530 |
Corrigendum 2 Against Tender Ref. No. TIFR/PD/CF20-48/200530 Construction of Lead Room of size 2.5*2.5*2.675mtrs at TIFR, FReTB Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046 |
29-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-11/200522 |
Supply, Installation and Commissioning of Turbo Molecular Pump for Tata Institute of Fundamental Research, Hyderabad. |
06-01-2021 upto 13.00 Hrs. |
|
TIFR/PD/IC20-9/200483 |
Corrigendum No. 3 for Supply, Installation and Commissioning of Ti:Sapphire Laser System of Peta-Watt class power for Tata Institute of Fundamental Research, Hyderabad |
14-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-30/200490 |
Corrigendum No. 3 for Supply, Installation and Commissioning of Spinning Disk Confocal System with Super ResolutionImaging for Tata Institute of Fundamental Research, Hyderabad |
10-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-07/20007 |
Corrigendum No. 3 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for Tata Institute of Fundamental Research, Hyderabad |
09-12-2020 upto 13.00 Hrs. |
|
TFR/PD/CA20-27/200399 |
Corrigendum No. 4 for Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad |
08-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CF20-48/200530 |
CORRIGENDUM No. 1 Against Tender Ref. No. TIFR/PD/CF20-48/200530 dated 23-11-2020 for Construction of Lead Room of size 2.5*2.5*2.675mtrs at TIFR, FReTB Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046 Join for Pre-Bid Meeting on Dec 04, 2020 11:00 AM India |
22-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CF20-47/200518 |
CORRIGENDUM No. 1 Against Tender Ref. No. TIFR/PD/CF20-47/200518 dated 24-11-2020 for Annual Maintenance Contract (AMC) for “Operation and Maintenance of Electrical & Fire Safety installations on 24 x 7 basis” on all days at TIFR, FReTB, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046. join for opening of Price bids on Jan 01, 2021 12:00 PM India |
15-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-9/200483 |
Corrigendum No. 2 for Supply, Installation and Commissioning of Ti:Sapphire Laser System of Peta-Watt class power for Tata Institute of Fundamental Research, Hyderabad |
14-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-30/200490 |
Corrigendum No. 2 for Supply, Installation and Commissioning of Spinning Disk Confocal System with Super ResolutionImaging for Tata Institute of Fundamental Research, Hyderabad |
10-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-07/20007 |
Corrigendum No. 2 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for Tata Institute of Fundamental Research, Hyderabad |
09-12-2020 upto 13.00 Hrs. |
|
TFR/PD/CA20-27/200399 |
Corrigendum No. 3 for Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad |
08-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CF20-47/200518 |
Annual Maintenance Contract (AMC) for “Operation and Maintenance of Electrical & Fire Safety installations on 24 x 7 basis” on all days at TIFR, FReTB, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046. join for opening of Price bids on Jan 01, 2020 12:00 PM India |
15-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CF20-48/200530 |
Construction of Lead Room of size 2.5*2.5*2.675mtrs at TIFR, FReTB Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad-500046. |
22-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-27/200399 |
Corrigendum No. 2 for Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad |
08-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-9/200483 |
Corrigendum No. 1 for Supply, Installation and Commissioning of Ti:Sapphire Laser System of Peta-Watt class power for Tata Institute of Fundamental Research, Hyderabad |
14-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-30/200490 |
Corrigendum No. 1 for Supply, Installation and Commissioning of Spinning Disk Confocal System with Super Resolution Imaging for Tata Institute of Fundamental Research, Hyderabad |
10-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-07/20007 |
Corrigendum No. 1 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for Tata Institute of Fundamental Research, Hyderabad Join for Pre-Bid Meeting on Nov 23, 2020 11:00 AM India BIDDERS WILL NOT BE ALLOWED TO JOIN AFTER 11.00 AM |
09-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-27/200399 |
Corrigendum No. 1 for Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad Join for Pre-Bid Meeting on Nov 19, 2020 11:00 AM India |
08-12-2020 upto 13.00 Hrs |
|
TIFR/PD/IC20-9/200483 |
Supply, Installation and Commissioning of Ti:Sapphire Laser System of Peta-Watt class power for Tata Institute of Fundamental Research, Hyderabad |
14-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-30/200490 |
Supply, Installation and Commissioning of Spinning Disk Confocal System with Super Resolution Imaging for Tata Institute of Fundamental Research, Hyderabad |
10-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/IC20-07/20007 |
Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for Tata Institute of Fundamental Research, Hyderabad Join for Pre-Bid Meeting on Nov 23, 2020 11:00 AM India BIDDERS WILL NOT BE ALLOWED TO JOIN AFTER 11.00 AM |
09-12-2020 upto 13.00 Hrs. |
|
TIFR/PD/CA20-27/200399 |
Supply, Installation and Commissioning of High-Performance Computing (HPC) Cluster for Tata Institute of Fundamental Research, Hyderabad Join for Pre-Bid Meeting on Nov 19, 2020 11:00 AM India |
08-12-2020 upto 13.00 Hrs |
|
TIFR/PD/TS/9014 |
Flooring work in Hanger Building-II at plot B, TIFR 36/P, Gopanpally Village, Serilingampally Mandal, Ranga ReddyDistrict, Hyderabad, Telangana 500046 Join Meeting on Dec 10, 2020 12:00 PM India |
27-11-2020 |
|
TIFR/PD/CF20-31/200407 |
Annual Maintenance Contract (AMC) for “Operation and Maintenance of HVAC installations on 24 x 7 basis” on all days at TIFR, FReTB, Survey No. 36/P, Gopanpally (Village),Serilingampally(Mandal), RR Dist, Hyderabad-500046. Opening of Price bids meeting on Nov 20, 2020 11:00 AM India |
06-11-2020 by 13.00 Hrs |
|
TFR/PD/CM20-265/200337 |
Supply, Installation, testing and commissioning of the indoor type 33KV Single – Phase Current Transformer (CT) AND Single-Phase Potential Transformer(PT) to TIFR, Hyderabad |
21-09-2020 by 10.00 Hrs |
|
TIFR/PD/CF20-19/200276 |
Annual Maintenance Contract for deploying Manpower for Plumbing/Carpentry Works/Operation & Maintenance of STP at TIFR, Survey No. 36/P, Gopanpally (Village), Serilingampally (Mandal), RR Dist., Hyderabad-500046. |
09-09-2020 by 13.00 Hrs |
|
|
PUBLIC TENDER NOTICE |
02-08-2020 |
|
TFR/PD/IC19-28/19028 |
Corrigendum No. 4 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad |
11-08-2020 upto 13.00 Hrs |
|
TFR/PD/IC19-47/190986 |
Corrigendum No. 4 for Supply, Installation, Commissioning of Bench-top EPR Spectrometer for TIFR Hyderabad |
10-08-2020 upto 13.00 Hrs. |
|
TFR/PD/IC19-48/190991 |
Corrigendum No. 4 for Supply, Installation, Commissioning of 2-Port Glove Box Work Station for TIFR Hyderabad. |
06-08-2020 upto 13.00 Hrs |
|
TFR/PD/IC19-26/19026 |
Corrigendum No. 4 for Supply, Installation, Commissioning of Modulated differential scanning calorimetry (DSC) with Specifications for TIFR Hyderabad. |
05-08-2020 upto 13.00 Hrs |
|
TFR/PD/IC19-25/19025 |
Corrigendum No. 4 for Supply, Installation, Commissioning of Thermogravimetric Analysis (TGA) Instrument with High Resolution and Modulated Specifications for TIFR Hyderabad. |
04-08-2020 upto 13.00 Hrs |
|
TFR/PD/IC19-27/19027 |
Corrigendum No. 4 for Supply, Installation, Commissioning of X-Ray Photoelectron Spectroscopy (XPS) for TIFR Hyderabad. |
03-08-2020 upto 13.00 Hrs |
|
TFR/PD/IC19-47/190986 |
Corrigendum 3 for Supply, Installation, Commissioning of Bench-top EPR Spectrometer for TIFR Hyderabad. |
24-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-48/190991 |
Corrigendum 3 for Supply, Installation, Commissioning of 2-Port Glove Box Work Station for TIFR Hyderabad. |
23-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-28/19028 |
Corrigendum 3 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad. |
22-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-26/19026 |
Corrigendum 3 for Supply, Installation, Commissioning of Modulated differential scanning calorimetry (DSC) with Specifications for TIFR Hyderabad. |
18-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-25/19025 |
Corrigendum 3 for Supply, Installation, Commissioning of Thermogravimetric Analysis (TGA) Instrument With High Resolution and Modulated Specifications for TIFR Hyderabad. |
17-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-27/19027 |
Corrigendum 3 for Supply, Installation, Commissioning of X-Ray Photoelectron Spectroscopy (XPS) for TIFR Hyderabad. |
16-06-2020 upto 13:00 Hrs |
|
TFR/PD/RC20-21/200001 |
Corrigendum 2 for Rate Contract For the Chemicals, Glassware’s and Lab wares for TIFR Hyderabad. |
15-06-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-47/190986 |
Corrigendum 2 for Supply, Installation, Commissioning of Bench-top EPR Spectrometer for TIFR Hyderabad. |
25-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-48/190991 |
Corrigendum 2 for Supply, Installation, Commissioning of 2-Port Glove Box Work Station for TIFR Hyderabad. |
22-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-28/19028 |
Corrigendum 2 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad. |
21-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-26/19026 |
Corrigendum 2 for Supply, Installation, Commissioning of Modulated differential scanning calorimetry (DSC) with Specifications for TIFR Hyderabad. |
20-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-25/19025 |
Corrigendum 2 for Supply, Installation, Commissioning of Thermogravimetric Analysis (TGA) Instrument With High Resolution and Modulated Specifications for TIFR Hyderabad. |
19-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-27/19027 |
Corrigendum 2 for Supply, Installation, Commissioning of X-Ray Photoelectron Spectroscopy (XPS) for TIFR Hyderabad. |
18-05-2020 upto 13:00 Hrs |
|
TFR/PD/RC20-21/200001 |
Corrigendum 1 for Rate Contract For the Chemicals, Glassware’s and Lab wares for TIFR Hyderabad. |
11-05-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-47/190986 |
Corrigendum No.1 for Supply, Installation, Commissioning of Bench-top EPR Spectrometer for TIFR Hyderabad. |
29-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-48/190991 |
Corrigendum No.1 for Supply, Installation, Commissioning of 2-Port Glove Box Work Station for TIFR Hyderabad. |
28-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-28/19028 |
Corrigendum No.1 for Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad. |
27-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-26/19026 |
Corrigendum No.1 for Supply, Installation, Commissioning of Modulated differential scanning calorimetry (DSC) with Specifications for TIFR Hyderabad. |
23-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-25/19025 |
Corrigendum No.1 for Supply, Installation, Commissioning of Thermogravimetric Analysis (TGA) |
22-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-27/19027 |
Corrigendum No. 1 for Supply, Installation, Commissioning of X-Ray Photoelectron Spectroscopy (XPS) for TIFR Hyderabad. |
21-04-2020 upto 13:00 Hrs |
|
TFR/PD/RC20-21/200001 |
Rate Contract For the Chemicals, Glassware’s and Lab wares for TIFR Hyderabad. |
15-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-47/190986 |
Supply, Installation, Commissioning of Bench-top EPR Spectrometer for TIFR Hyderabad. |
08-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-26/19026 |
Supply, Installation, Commissioning of Modulated differential scanning calorimetry (DSC) with Specifications for TIFR Hyderabad. |
08-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-48/190991 |
Supply, Installation, Commissioning of 2-Port Glove Box Work Station for TIFR Hyderabad. |
07-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-25/19025 |
Supply, Installation, Commissioning of Thermogravimetric Analysis (TGA) |
07-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-28/19028 |
Supply, Installation and Commissioning of GPU based High Performance Computing Cluster for TIFR Hyderabad. |
06-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-27/19027 |
Supply, Installation, Commissioning of X-Ray Photoelectron Spectroscopy |
06-04-2020 upto 13:00 Hrs |
|
TFR/PD/IC19-24/19024 |
Supply, Installation and Commissioning of Compute Nodes for a High Performance Computing (HPC) Cluster for TIFR Hyderabad |
02-03-2020 upto 13.00 Hrs |
|
TIFR/PD/CF19-121/190973 |
Annual Maintenance Contract for Engaging of Two Unskilled Gardener for maintenance of Horticulture and landscapling work at TIFR, FReTB, Survey No. 36/P, Gopanpally(Village), Serilingampally(Mandal), RR Dist, Hyderabad – 500046 |
24-02-2020 upto 13:00 Hrs |
|
TFR/PD/CA19-86/190853 |
Corrigendum 1 Enquiry letter for supply of AMD Epyc based HPC Cluster with five years warranty – 01No to TIFR, Hyderabad |
24-02-2020 |
|
TFR/PD/CA19-86/190853 |
Enquiry letter for supply of AMD Epyc based HPC Cluster with five years warranty – 01No to TIFR, Hyderabad |
24-02-2020 |
|
TIFR/PD/GT/TS/CF-21/19021 |
Clarification for the work of “Expression of Interest for providing Comprehensive Consultancy Services for setting up a State of the art Academic cum Residential campus for TIFR at Hyderabad, Telangana, India.” |
10-02-2020 upto 15:00 Hrs |
|
TIFR/PD/CA19-88/190878 |
Enquiry letter for supply of Cyclic Voltammetry with specifications – 01No to TIFR, Hyderabad |
03-02-2020 |
|
TFR/PD/CA19-23/19023 |
Enquiry letter for supply, installation, testing, commissioning, integration and training on video conference equipment to build state of the art E-class room for TIFR, Hyderabad |
06-02-2020 at 13:00 Hrs |
|
TFR/PD/CF19-107/190831 |
Electrical Works for Hanger Building – II in Plot – B, at TIFR, Hyderabad |
22-01-2020 upto 13:00 Hrs. |
|
TFR/PD/TS/9010 |
Construction of Hanger Building-2 Super Structure Work in Plot-B at TIFR, Hyderabad. |
31-12-2019 upto 17:00 Hrs. |
|
TIFR/PD/GT/TS/CF-21/19021 |
EOI for Providing Comprehensive Consultancy Services for setting up a State of the art Academic cum Residential Campus for TIFR at Hyderabad, Telangana, India |
10-02-2020 upto 15:00 Hrs. |
|
TFR/PD/IC19-35/ 190789 |
Corrigendum No. 1 for Supply, Installation, Commissioning of Upright Spectral Confocal Microscope System Upgradable with High Resolution Attachments for TIFR Hyderabad. |
20-01-2020 upto 13:00 Hrs. |
|
TFR/PD/IC19-35/ 190789 |
Supply, Installation, Commissioning of Upright Spectral Confocal Microscope System Upgradable with High Resolution Attachments for TIFR Hyderabad. |
20-01-2020 upto 13:00 Hrs. |
|
TFR/PD/IC19-19/19019 |
Supply, Installation, Commissioning of High Resolution X-Ray Diffractometer of Thin Film Analysis for TIFR Hyderabad. |
20-01-2020 upto 13:00 Hrs. |
|
TFR/PD/IC19-32/190729 |
Supply, Installation, Commissioning of Turbo Molecular Pumps for UHV Application for TIFR Hyderabad. |
21-01-2020 upto 13:00 Hrs. |
|
TFR/PD/IC19-31/190704 |
Supply, Installation, Commissioning of Auger Electron Spectrometer for TIFR Hyderabad. |
21-01-2020 upto 13:00 Hrs. |
|
TFR/PD/CF19-92/190775 |
Construction of Hanger Building-2 ( MS Structure & Roofing works) in Plot-B at TIFR, Hyderabad. |
10-01-2020 upto 17:00 Hrs. |
|
TFR/PD/TS/9010 |
Construction of Hanger Building-II (Superstructure) in Plot-B at TIFR, Hyderabad. |
31-12-2019 upto 17:00 Hrs. |
|
TFR/PD/TS/9009 |
Construction of Hanger Building-2 (Substructure Work) in Plot-B at TIFR, Hyderabad. |
30-12-2019 upto 17:00 Hrs. |
|
TFR/PD/IC19-18/19018 |
Supply, Installation, Commissioning of A state-of-the-art Ultra Microtome for the facility to generate ultra-thin sections for TEM imaging for TIFR Hyderabad. |
04-11-2019 upto 13.00 Hrs. |
|
TFR/PD/IC19-17/19017 |
Supply, Installation, Commissioning of Floor Model Ultra and 4 Litre Floor Model High Speed Centrifuge for TIFR Hyderabad. |
04-11-2019 upto 13.00 Hrs. |
|
TFR/PD/IC19-16/19016 |
Supply, Installation, Commissioning of Laser Capture Microdissection System for TIFR Hyderabad. |
01-11-2019 upto 13.00 Hrs. |
|
TFR/PD/IC19-03/19003 |
Supply, Installation, Commissioning of automated high throughput system for NGS library preparation for RNA, immune profiling, surface marker protein, CRISPR, and ATAC applications at Single Cell resolution for TIFR Hyderabad. |
01-11-2019 upto 1300 hrs |
|
TIFR/PD/190463/CF19-59 |
TENDER FOR PROVIDING CATERING SERVICES TO TIFR HYDERABAD CAMPUS AT GOPANPALLY, HYDERABAD |
14-10-2019 at 1300 hrs |
|
TIFR/PD/CF19-34/190228 |
Corrigendum-1 for Annual Maintenance Contract for deploying Manpower for Plumbing and Carpentry Works at TIFR. |
05-08-2019 upto 13.00 Hrs |
|
TIFR/PD/CF19-34/190228 |
Annual Maintenance Contract for deploying Manpower for Plumbing and Carpentry Works at TIFR. |
01-08-2019 upto 13.00 Hrs |
|
TIFR/PD/CF19-8/190034 |
“Providing Transportation Services” to TIFR Hyderabad campus. |
20-05-2019 upto 17.30 Hrs |
|
TFR/PD/IC18/F-707/180020 |
Corrigendum No. 1 for Supply, Installation, Commissioning of 600 MHz Nuclear Magnetic Resonance Spectrometer for TIFR Hyderabad. |
29-03-2019 upto 13.00 Hrs |
|
TFR/PD/IC18/F-707/180020 |
Supply, Installation, Commissioning of 600 MHz Nuclear Magnetic Resonance Spectrometer for TIFR Hyderabad. |
22-03-2019 upto 13.00 Hrs |
|
TIFR/ADM/CF18-122/180714 |
Corrigendum No. 3 for TENDER FOR PROVIDING HOUSEKEEPING SERVICES FOR TIFR HYDERABAD CAMPUS AT GOPANPALLY, HYDERABAD. |
05-03-2019 upto 13.00 Hrs. |
|
TIFR/ADM/CF18-122/180714 |
Corrigendum No. 2 for TENDER FOR PROVIDING HOUSEKEEPING SERVICES FOR TIFR HYDERABAD CAMPUS AT GOPANPALLY, HYDERABAD. |
01-03-2019 upto 13.00 Hrs. |
|
TIFR/ADM/CF18-122/180714 |
Corrigendum No. 1 for TENDER FOR PROVIDING HOUSEKEEPING SERVICES FOR TIFR HYDERABAD CAMPUS AT GOPANPALLY, HYDERABAD. |
01-03-2019 upto 13.00 Hrs. |
|
TIFR/ADM/CF18-122/180714 |
TENDER FOR PROVIDING HOUSEKEEPING SERVICES FOR TIFR HYDERABAD CAMPUS AT GOPANPALLY, HYDERABAD. |
01-03-2019 upto 13.00 Hrs. |
|
TFR/PD/IC18-28/F-431/180436 |
Corrigendum No. 3 for Supply, Installation, Commissioning of 5 Axis Turn Mill Machine for TIFR Hyderabad. |
14-02-2019 upto 13.00 Hrs. |
|
TFR/PD/IC18-29/F-432/180437 |
Corrigendum No. 2 for Supply, Installation, Commissioning of Submerged Type Wire-Cut EDM Machine for TIFR Hyderabad. |
08-02-2019 upto 13.00 Hrs |
|
TFR/PD/IC18-28/F-431/180436 |
Corrigendum No. 2 for Supply, Installation, Commissioning of 5 Axis Turn Mill Machine for TIFR Hyderabad. |
07-02-2019 upto 13.00 Hrs |
|
TFR/PD/IC18-29/F-432/180437 |
Corrigendum No. 1 for Supply, Installation, Commissioning of Submerged Type Wire-Cut EDM Machine for TIFR Hyderabad. |
08-01-2019 upto 13.00 Hrs |
|
TFR/PD/IC18-28/F-431/180436 |
Corrigendum No. 1 for Supply, Installation, Commissioning of 5 Axis Turn Mill Machine for TIFR Hyderabad. |
07-01-2019 upto 13.00 Hrs |
|
TFR/PD/IC18-33/F-468/180482 |
Supply, Installation, Commissioning of Surface Plasmon Resonance Instrument for Real Time Detection of Biomolecular Interactions for TIFR Hyderabad |
27-11-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-29/F-432/180437 |
Supply, Installation, Commissioning of Submerged Type Wire-Cut EDM Machine for TIFR Hyderabad |
26-11-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-28/F-431/180436 |
Supply, Installation, Commissioning of 5 Axis Turn Mill Machine for TIFR Hyderabad |
26-11-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-27/F-430/180435 |
Supply, Installation, Commissioning of Closed Cycle SQUID Instrument for TIFR Hyderabad |
26-11-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-26/F-395/180422 |
Supply, Installation, Commissioning of Compute Nodes for High Performance |
30-10-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-78/180373 |
Construction of Steel Structure Mezzanine Floor for Hangar at 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad |
23-10-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-85/180406 |
Site Clearance of approximate 5.0 acres in Plot-B infront of FReT-B for immdiate infrastructure developements at Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad |
23-10-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-84/180405 |
Construction of Powder coated Aluminium partition for individual laboratories on ground floor and Mezzanine floor ( PI Rooms and Student sitting area) in First Hangar Structure in Plot-B opposite to FReT-B at Survey No. 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy |
24-10-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-86/180407 |
Supply, installation, Testing and Commissioning of Internal electrification and all related works in lab areas of TIFR facility at 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad-500107 |
29-10-2018 upto 13.00 Hrs |
|
TIFR/ADM/CF18-73/180362 |
TENDER FOR PROVIDING ROUND THE CLOCK SECURITY SERVICES FOR TIFR PERMANENT CAMPUS AT GOPANPALLY, HYDERABAD |
15-10-2018 upto 13.00 Hrs |
|
TFR/PD/CHA/WO18-01/F-1/1001 |
Engagement of Clearing and Forwarding Agency for Customs Clearance of Imported Consignments for TIFR Hyderabad Campus. |
30-07-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-14/F-222/180220 |
Supply, Installation, Commissioning of Compact Confocal Module upgradable to Super-Resolution for TIFR Hyderabad. |
26-07-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-15/180113 |
Annual Maintenance Contract (AMC) for “Operation and Maintenance of Electrical & Fire Safety installations on 24 x 7 basis” on all days at TIFR, Hyderabad Campus. |
25-07-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-03/F-78/180078 |
Corrigendum No. 2 for Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad. |
25-06-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-14/180109 |
Annual Maintenance Contract for “Operation and Maintenance of Water Supply, Sewerage, Sanitation, Plumbing including servicing of Sanitary fittings & fixtures, Rain water Harvesting System and Fire fighting installations on 24 x 7 basis” on all days at TIFR, Hyderabad. |
19-06-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-16/180114 |
Annual Maintenance Contract for “Operation and Maintenance of HVAC installations on 24 x 7 basis” on all days at TIFR, Hyderabad. |
21-06-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-15/180113 |
Annual Maintenance Contract (AMC) for “Operation and Maintenance of Electrical & Fire Safety installations on 24 x 7 basis” on all days at TIFR, Hyderabad Campus. |
20-06-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-03/F-78/180078 |
Corrigendum No.1 for Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad |
11-06-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-06/F-101/180099 |
Supply, Installation, Commissioning of Pulsed Nd: YAG Laser System for TIFR Hyderabad |
12-06-2018 upto 13.00 Hrs |
|
TFR/PD/IC18-03/F-78/180078 |
Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad |
11-06-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-9/180080 |
Corrigendum No. 1 for Providing Round the Clock Security Services for TIFR Permanent Campus at Gopanpally, Hyderabad |
31-05-2018 upto 13.00 Hrs |
|
TIFR/PD/CF18-9/180080 |
Tender for Providing Round the Clock Security Services for TIFR Permanent Campus at Gopanpally, Hyderabad |
31-05-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-04/F-714/217003 |
Supply, Installation, Commissioning & Training of Sanger Sequencer and |
16-03-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-03/F-713/217002 |
Supply, Installation, Commissioning of Double Door Autoclave for TIFR Hyderabad. |
16-03-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-02/F-518/217001 |
Supply, Installation, Commissioning of 600 MHz State of the Art Wide Bore NMR Spectrometers to Carry out High Resolution NMR Experiments in Solid State for TIFR Hyderabad. |
06-03-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-01/F-517/217000 |
Corrigendum No. 2 for Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad. |
30-01-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-01/F-517/217000 |
Corrigendum No. 1 for Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad. |
24-01-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-01/F-517/217000 |
Supply, Installation, Commissioning of High Performance Computing (HPC) Cluster for TIFR Hyderabad. |
24-01-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-78/170491 |
Supply, Installation, Commissioning of Glove Box Work Station for TIFR Hyderabad. |
04-01-2018 upto 13.00 Hrs |
|
TFR/PD/IC17-77/170490 |
Supply, Installation, Commissioning of Pulsed Dye Laser System and related accessories for TIFR Hyderabad. |
04-01-2018 upto 13.00 Hrs |
|
TFR/PD/F-386/IC17-54/170376 |
Supply, Installation, Commissioning and Training for Automated, High Speed, Multi-color Fluorescence Activated Cell Sorter (FACS) for TIFR Hyderabad. |
21-11-2017 upto 13.00 Hrs |
|
TFR/PD/F-302/170294 |
Construction of Hangar Structure for Housing Workshop & Laboratory Space at 36/P, Gopanpally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad. |
12-10-2017 upto 13.00 Hrs |